작업 진행률 42.6%
'진행중인 작업 > YU-NO' 카테고리의 다른 글
E05, E05_01, E18, E18_01 작업 완료. (0) | 2019.02.26 |
---|---|
E06, E06_01, E09, E09_01, E09_02 작업 완료. (0) | 2019.01.31 |
C02_07, C02_08, C02_09, C_END, C3_END 작업 완료. (0) | 2018.11.27 |
C01_01B, C01_01C, C25_03, C20_02, C02_05, C02_06, C02_06B 작업 완료. (0) | 2018.09.05 |
C19, C19_01, C24_06, C26_03, C36_05 작업 완료. (0) | 2018.06.20 |